Call Today For a Free Quote
Please Fill out the Submission Form to get Started.
Construction Signage Requirement for NYC. All our signs include a UV protective coating to protect against the elements.
New Construction Site Signage Rules
Sidewalk shed signs must be posted on the parapet that runs along the long axis of the sidewalk shed also to include a sidewalk bridge sign. The sign cannot be posted above or below the level of the parapet and must be posted at least three foot and no more than six foot from the left edge of the sidewalk bridge panel and must be noticeable by individuals from across the street on the long axis of the sidewalk shed and facing the sidewalk shed or where a project information panel is also required. The horizontal center of the sidewalk shed panel must be in line with a vertical plane drawn through the horizontal center of the project information. NYC DOB signs sidewalk shed signs.